Q1. Multiple choice questions (Attempt all · 15 × 1 = 15)
The empirical relationship between mean, median and mode is, made=:
Mid-point of class limit is also called:
A qualitative variable is called:
For an open and frequency distribution.It is not possible to calculate:
The graph of frequency distribution is called:
Uniform of a student is an example of:
Mode is not affected by:
Both length and width are used in:
The measure which is calculated from sample is called:
If
, which of the following is minimum:
Graph of time series is called:
U is called:
Middle most value of the m observations arranged in ascending or descending order of magnitude is called:
Row caption is also called:
The life time of TV tube is:
Q2. Short questions (Attempt any 10 of 15 · 10 × 2 = 20)
The sum of deviation of 15 values from 20 is 45. Find Arithmetic mean.
What does ...... denote for?
Define primary data.
The wages of six workers in rupees are 1800,1900,1700,2200,2000 and 1600. Find mean.
Define multiple bar chart.
Define discrete data.
If mode=125, mean=80 is a skewed distribution calculate medians.
Define Historigram.
Explain the difference between population and sample.
Calculate median from the data:9,5,6,3,10,14,7,11,14,18
Define simple bar chart.
What is constant and variable?
Give mode for the data: 10,20,30,10,40,50,10,60
What is meant by component bar chart.
What is quantitative varaiable.
Q3. Long questions (Attempt any 3 of 5 · 3 × 5 = 15)
Make frequency distribution from the following data taking classes as: 0-1, 2-3, 4-5,-5,0,1,4,0,2,8,2,0,4,2,1,0,7,3,1,2,6,0,2,2,5,7,2,3,9,6,3,4,5,4,1,2,3,1,5
Calculate A.M from the following distribution by coding method:
Groups 1.5-2.0 2.0-2.5 2.5-3.0 3.0-3.5 3.5-4.0 4.0-4.5 Frequency 3 7 10 15 9 6 Make a frequency distribution taking I as class interval: 2,8,10,9,7,9,4,3,5,6,8,7,9,6,6,11,1,5,6,6,5,7
Find the median from the following:
C.Limit 60-62 62-64 64-66 66-68 68-70 F 5 18 42 27 8 Construct a pie diagram to represent the cost of construction of a house:
Item Labour Bricks Cement Steel Timber Supervision Exp 2500 1500 2000 1500 1000 1500